Scope of work; Two 16″ Separators, 1440psi, 3 Phase with Production Tanks and Loadouts. Package was completely flooded and frozen. Instrumentation Checked, Vessels Inspected, Drawings Completed, Paint, etc.
If you are interested in exploring similar opportunities, reach out through our Contact Us page. Or stay informed by subscribing to our newsletter at the bottom of this page.